Fast Charge California (CALeVIP) 2026: Get Up to $110,000 per Dual-Port DC Fast Charger

November 19, 2026

ICAPIA Ultra Series EV Chargers – CALeVIP fast charge California in Torrance, California 90505

California’s Fast Charge California Project (CALeVIP) pays up to $55,000 per DC fast charging port, which means a dual-port ICAPIA DC ULTRA 360 can qualify for $110,000. The current application window is open until January 14, 2027, and funding goes to ready-to-build projects first-come, first-served.

Quick answer: CALeVIP grants for ICAPIA DC fast chargers

$110,000DC ULTRA 360 (two 180 kW ports)
$55,000DC ULTRA 240
$55,000DC FAST 180

Window 2 closes January 14, 2027 at 5 p.m. PT. Funding is first-come, first-served, and you must be ready to build before you apply.

Check My ProjectCall (844) 442-2742

Below, we explain how much each charger qualifies for, who is eligible and what you need to apply on time. As an EV charging solutions company based in Torrance, California, ICAPIA helps businesses get DC fast charging projects ready for CALeVIP.

What Is Fast Charge California (CALeVIP)?

The California Electric Vehicle Infrastructure Project (CALeVIP) is run for the California Energy Commission. In May 2026, the Commission announced $55.2 million in new funding for public DC fast chargers through its Fast Charge California Project.

The grants can cover up to 100% of approved project costs, including the chargers and their installation. The money is released in two application windows, and each one closes early if funding runs out. You may also see these California EV fast charger grants called CALeVIP rebates or incentives.

CALeVIP Grant Amounts and Deadlines

Application windowDatesGrant per port
Window 2 (open now)October 7, 2026 – January 14, 2027$55,000 for 150–274 kW
$100,000 for 275 kW or more
Window 3February 24 – May 27, 2027$55,000 for 150 kW or more

The grant is based on each port’s guaranteed output: the power it can deliver even when the charger’s other port is in use. Ports under 150 kW do not qualify.

How Much ICAPIA Chargers Qualify For

ICAPIA DC ULTRA Series dual-port DC fast charger – CALeVIP fast charge California in Torrance, California 90505
ICAPIA chargerGuaranteed outputCALeVIP grant
DC ULTRA 360180 kW + 180 kW (two ports)$110,000
DC ULTRA 240One port at 150 kW or more$55,000
DC FAST 180One port at 150 kW or more$55,000

The DC ULTRA 360 delivers 180 kW on each port, even when two vehicles charge at once. Both ports clear the 150 kW minimum, so it earns the grant twice.

The DC ULTRA 240 and DC FAST 180 split their power when two vehicles charge (for example, 120 kW + 120 kW on the ULTRA 240). They qualify with one port: either as a single-port model, or set permanently to “sequential use,” where only one port charges at a time.

CALeVIP grant calculator

Pick your ICAPIA charger and how many you plan to install.

Estimated CALeVIP grant (Window 2)–
Check My Eligibility

Estimate only. Grants pay $55,000 per port with 150 kW or more of guaranteed output, up to 100% of approved project costs. Final awards depend on CALeVIP approval and available funding.

Want to apply before January 14?

ICAPIA helps you choose a qualifying charger, plan the site and line up the permit and utility paperwork you need to apply.

Start My CALeVIP ProjectSee DC Fast Charging Solutions

Who Is Eligible for CALeVIP Fast Charging Grants?

  • Public access. Chargers must be available to the public. Hotels, charging hubs and business districts are no longer eligible site types.
  • Ready to build. You need issued permits and a final utility service design, or a utility letter saying no new service is needed.
  • CCS connectors. At least half of the connectors at each site must be CCS.
  • One application per site. Only one application per site can receive funding.
  • Priority areas. Ready-to-build projects in disadvantaged, low-income and tribal communities move to the front of the queue.

Planning a public site? See how ICAPIA supports DC fast charging for convenience store EV charging, travel center EV charging and highway EV charging stations.

How to Get Ready to Apply: CALeVIP Requirements Checklist

  1. Confirm your site. Make sure it is publicly accessible and an eligible site type.
  2. Choose a qualifying charger. Pick a model with 150 kW or more of guaranteed output per port, such as the ICAPIA DC ULTRA.
  3. Request your utility service design. Utility timelines are often the longest step, so start early.
  4. Get your permits. Applications without issued permits are not accepted. ICAPIA provides commercial EV charger installation through a certified installer network.
  5. Apply as soon as you are ready. Funding is first-come, first-served, so earlier applications have the best chance.

Planning your budget too? See our guide to EV charger installation costs in 2026 and our California EV charging incentives update. For other programs, see EV charging incentives, rebates and grants.

CALeVIP Fast Charging Grant FAQs

How much does CALeVIP pay per DC fast charging port?

In the current window (October 7, 2026 – January 14, 2027), CALeVIP pays $55,000 per port with 150–274 kW of guaranteed output, and up to $100,000 per port at 275 kW or more. The next window (February 24 – May 27, 2027) pays $55,000 per port for 150 kW or more.

Does a dual-port charger count as two ports?

Yes. CALeVIP pays per port, and each port needs at least 150 kW of guaranteed output when both are in use. The ICAPIA DC ULTRA 360 delivers 180 kW on each port at the same time, so it qualifies for $110,000.

What do I need before I can apply?

Your project must be ready to build: issued permits and a final utility service design (or a utility letter saying no new service is needed). Applications missing either are not eligible.

Are hotels eligible for Fast Charge California?

No. In the current window, chargers must be open to the public, and hotels, charging hubs and business districts are no longer eligible site types.

When does Fast Charge California Project Window 2 close?

Window 2 of the Fast Charge California Project opened October 7, 2026 at 9 a.m. PT and closes January 14, 2027 at 5 p.m. PT, or earlier if funding runs out. Window 3 runs February 24 – May 27, 2027 and pays up to $55,000 per port for chargers with 150 kW or more.

Does CALeVIP cover installation costs?

Yes. CALeVIP grants can cover up to 100% of approved project costs, including the chargers and their installation, up to the grant amount per port. ICAPIA helps you choose a qualifying charger, plan the site and line up the permit and utility paperwork you need to apply.

Get help with your CALeVIP project

Tell us about your site. An ICAPIA specialist will confirm which chargers qualify and help you get ready to apply before the deadline.

    No obligation. Your details go only to the ICAPIA sales team.

    Prefer to talk? Call (844) 442-2742.

    Leave a Comment

    Call Now Button